Pitney-bowes DI600 Inserting System Instrukcja Użytkownika Strona 39

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 38
Operator Functions • 3
3-9SV40221 Rev. C
For a C fold Job: Load the
Sheet Feeders from the
top feeder downwards, in
sequence (prime sheet in top
feeder).
Load Sheets Face Up and Top
First.
For a Single fold job: Load the
Sheet Feeders from the bottom
feeder upwards, in sequence
(prime sheet in bottom feeder).
Load Sheets Face Down and
Bottom First.
Loading Insert Feeder(s)
If either or both Insert Feeders are loaded with material when
SwiftStart is selected, the machine will feed the Inserts and make
them part of the SwiftStart™ job.
For a single Insert, load Insert Feeder F. For two Inserts, load Insert
Feeders F and G.
Booklets must be loaded into Insert Feeder F only and should be
loaded with the binding edge first.
Pre-folded Inserts should be fed with the open edge last.
Reply Envelopes (BRE’s) must be loaded flap side down, flap first.
Loading Envelope Feeder
Envelopes are loaded into Envelope
Feeder E flap side up, flap last.
Przeglądanie stron 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 127 128

Komentarze do niniejszej Instrukcji

Brak uwag